久久婷婷婬片A片AAA|欧美性受XXXX黑人XYX性爽|夜夜躁狠狠躁日日躁av|国产乱国产乱老熟300视频

Language

NEWS CENTRE

News


Your Current Location:Home > News > Group news


How to solve the problems in the process of processing stainless steel flanges

Release Time:2022-8-19 16:25:04      Hit Count:227

The processing of stainless steel flange needs to understand and pay attention to some problems:


1. Weld defects: the weld defects of stainless steel flange are serious. If manual and mechanical polishing is used to make up for them, the grinding marks will cause uneven surface and affect the appearance;


2. Uneven polishing and passivation: pickling and passivation treatment is carried out after manual polishing and polishing. It is difficult to achieve uniform treatment effect for workpieces with large area, and ideal uniform surface cannot be obtained. It also has the disadvantages of labor cost and high auxiliary material cost;


3. Scratches are difficult to remove: the overall pickling passivation will cause chemical corrosion or electrochemical corrosion and rust in the presence of corrosive media, and also can not remove carbon steel, spatter and other impurities adhering to the surface of stainless steel due to scratch and welding spatter;


So how to solve the problem of stainless steel flange processing?


1. Select blanking and enter the next process after completion. Different stainless steel workpieces enter the corresponding process according to the processing requirements;


2. During bending, the cutter and cutter groove used for bending shall be determined according to the size on the drawing and the thickness of stainless 304 seamless steel pipe. It is the key to select the upper die to avoid the deformation caused by the collision between the product and the cutter (in the same product, different models of upper die may be used). The selection of the lower die is determined according to the thickness of the plate.


3. In order to weld firmly, the bumps are made on the workpiece to be welded, which can make the bumps contact with the flat plate evenly before the power on welding, so as to ensure the consistent heating of each point. At the same time, the welding position can also be determined. If welding is required, the pre pressing time, holding time, holding time and rest time should be adjusted to ensure that the workpiece can be spot welded firmly.


Previous:Origin and development of water pipe
Next:Difference between elbow and elbow in manufacturing process

Back to list

亚洲精品久久久久毛片a一级演员 | 日本道精品一区二区三区 | 国产人妻精品一区二区三区秋霞 | 中文字字幕在线中文乱码电影 | 120秒一区二区三区使用方法 | 国产交换配乱婬视频a麻豆 国产精品无码无套在线照片 | 午夜国产手机在线视频 | 日本无码人妻精品一区二区三区 | 一本色道久久综合无码 | 国产免费成人视频 | 日本高清一区二区三区 | 久久国产成品亚洲精品影院 | 亚洲熟人妇一区二区三区 | 中国古装一级婬妇AAA | 性欧美婬妇AAAA免费 | 国产一级特黄a高潮片 | 高潮国产白浆抽搐的视频免费软件 | 国产三级国产精品国产普男人 | 国产人妻 精品无码一新浪 一级A片久久久免费直播间 | 精品少妇嫩草aⅴ凸凹视频 国产免费人做人爱午夜视频 | 精品国产乱码久久久久久蜜柚 | 亚洲国产高清无码 | 无码人妻丰满熟妇区蜜桃 | 日本理伦公与丰满熄中文字幕 | 无码国产69精品久久久久久久播放 | 国产精品成人影片 | 精品人妻艳妇嫩草AV少妇 | 久久综合五月丁香六月 | 欧美一级婬片A片免费播放绣春 | 国精产品一区一区三区视频 | 久久久国产精品一区二区白洁老师 | 亚洲AV无码国产精品午夜久久a | 无码欧美精品一区二区蜜桃色欲 | 波多洁衣免费无码婬片AAAA片 | 熟妇人妻无乱码中文字幕蜜桃 | 免费观看理论片A片高清免费观看 | 中文字幕人成乱码熟女香港 | 亚洲在线观看视频 | 影音先锋av看片资源 | 欧美日韩国产精品 | 国产免费无码一区二区三区 |